FUTURES APW111721c,17V-21.6V,RSPri_V1.25,EMC
| Function |
S23 Hyd./S21e XP Hyd./S21 XP+ Hyd./S21e Hyd./S21 Hyd./S21+ Hyd./S19 Hyd./T19 Hyd./T19 Pro Hyd./S19 Pro Hyd./S19 Pro+ Hyd./S19 XP Hyd./S19e XP Hyd./S21 XP Hyd./S19 XP+ Hyd.
Hydro-cooling Miner
|
| Specifications |
|
| Price |
318 $/T
318 $/Unit
|
| Shipping Date |
Shipping in 15 working days after fully paid
|
| Payment Method |
S23 Hyd.
S21e XP Hyd.
S21 XP+ Hyd.
S21e Hyd.
S21 Hyd.
S21+ Hyd.
S19 Hyd.
T19 Hyd.
T19 Pro Hyd.
S19 Pro Hyd.
S19 Pro+ Hyd.
S19 XP Hyd.
S19e XP Hyd.
S21 XP Hyd.
S19 XP+ Hyd.
|
Specifications
| Product Glance | |
| Out1 | |
| DC Voltage | 17V-21.6V |
| Rated Current(380V input) | 300A |
| Rated Power(380Vinput) | 6500W |
| Short Circuit Protection | >10mS |
| Detailed Characteristics | |
| Out2 | |
| DC Voltage | 12.3V |
| Rated Current(220 V input) | 1A |
| Voltage Accuracy | 12.2V---12.4V |
| Short Circuit Protection | >10mS |
| Input | |
| Voltage Range | 380-415V AC |
| Frequency Range | 50~60 Hz |
| Power Factor | >0.99(full load) |
| Protection | |
| Low-voltage Input | < 304V AC |
| Output Short Circuit | Yes |
| Overheat Protection | Yes |
| Over-current Output | 300A-350A |
| Environment | |
| Operating Temperature | -20-45℃ |
| Operating Humidity | 20%-90%RH(non--condensing) |
| Altitude | < 2000m |
| Structure | |
| Dimensions | 320mm*179mm*63mm |
| Net Weight | 5kg |
| Cooling System | Water cooling |
| Inlet temperature | 20-35 ℃ |
| Water flow rate | 8L/min |
Purchasing Guidelines
NOTES
1. One account can purchase a maximum of 500 units.
2. The shipping costs, cutsoms charges, and taxes(if any) are not included in the retail price shown above.
3. After an order has been submitted, a request to cancel the order, refund any part of the ordered amount or change the ordered item(s) to different item(s) or different batch(es) will not be entertained by BITMAIN.
4. The pictures shown are for reference only; the final shipment version shall prevail.
SHIPPING DETAILS
1. The products are made in China. If shipping to the U.S., customers will need to pay tariff.
2. Shipments will be scheduled on a first-paid-first-ship basis for orders on which BITMAIN has received full payment.
3. You are responsible for any customs delays or returned shipments due to a lack of proper documentation. It's highly recommended to be aware of local customs clearance policies and to prepare all customs documentation ahead of time to avoid any customs clearance delays or unexpected costs.
Warranty
CLICK for >> Parts & Materials Ordering Notes and Warranty Information
Please read BITMAIN’s Terms & Conditions for a complete list of conditions and terms that apply to all orders placed on bitmain.com.